TR | ENG


Safranbolu - Bartın Highway Construction

16 km portion of the Safranbolu-Bartın highway is constructed and there exist,


  • 530.000 m3 earth fill,
  • 225.000 m3 rock excavation,
  • 575.000 m3 excavation and a lot of road structures.

In this construction,


  • 3 moto-scrapers,
  • 2 scrapers,
  • 4 D8 bulldozers,
  • 20 dump trucks,
  • 2 pairs of sheep foot rollers and 2 vibrating cylinders

are used as the construction machinery.

The highway is constructed in 5,5 months on a steep, mountainous and woodland country.

Sketch