
Safranbolu - Bartın Highway Construction
16 km portion of the Safranbolu-Bartın highway is constructed and there exist,
- 530.000 m3 earth fill,
- 225.000 m3 rock excavation,
- 575.000 m3 excavation and a lot of road structures.
In this construction,
- 3 moto-scrapers,
- 2 scrapers,
- 4 D8 bulldozers,
- 20 dump trucks,
- 2 pairs of sheep foot rollers and 2 vibrating cylinders
are used as the construction machinery.
The highway is constructed in 5,5 months on a steep, mountainous and woodland country.