Diyarbakır – Karakaya Dam

Karakaya Dam

Project Status:

Completed

Year of Production:

1976 – 1987

Route:

Diyarbakır – Çüngüş

Field:

9.580,00 hm³

Location:

Diyarbakır

ADMINISTRATION State Hydraulic Works (DSİ)-TURKEY

LOCATION On the Euphrates River in southeastern Turkey

CONTRACTOR J.V. Italstrade Torno-ERG

TENDER AMOUNT 600 x 106 U.S.$ (Construction cost only)

RESERVOIR

Volume 9.58 x 109 m³

Active volume 5.58 x 109 m³

Max. bad 693 m

The area is 29,800 ha.

Basin 80 km²

Length 166 km

DAM

Type Belt-weight

Height from foundation: 173 m

Crest elevation 698 m

Crest length 462 m

Concrete volume 2 x 10⁶ m³

Filling station 10 pcs. radial-gated, crest-mounted, 17,100 m³/s flow rate

DERIVATION TUNNELS 2 x 11.50 m diameter, circular, 3,500 m3/s flow rate.

CENTRAL Body inside 6 x 300 – 1,800 MVA

capacity of 7.5 x 109 kWh/year energy production