The Ankara-Niğde Highway Project is part of the Trans-European North-South Highway (TEM) Project, a sub-regional cooperation project established in 1977 with the technical and administrative support of the United Nations Economic Commission for Europe. The TEM project, which includes the Ankara-Niğde Highway, starts in Edirne, passes through Istanbul, and continues via Bolu, Ankara, and Pozantı to reach Adana and Gaziantep, ending in Şanlıurfa. It also includes the Şanlıurfa-Habur section, which is planned for future construction.
The Ankara-Niğde Highway, one of the important sections of the TEM, forms the missing part of the South Turkey TEM network.
With the construction and commissioning of the Ankara-Niğde section, a seamless Europe-Middle East transport link has been established via Turkey as a bridge country.
Maraş – Narlıova 2. Section Irrigation Project Status: Completed Year of Production: 1967 – 1968 Route: Kahramanmaraş Field: 646 km Location: Kahramanmaraş Maraş, Narlıova II.
Karakoçan Dam Project Status: Completed Year of Production: 1969 – 1973 Route: Elazığ – Karakoçan Field: 1.037.000 m3 Location: Elazığ All facilities of this dam,
Erzincan–Tercan Dam Project Status: Completed Year of Production: 1969 – 1973 Route: Erzincan – Tercan Field: 2.400.000 m3 Location: Erzincan The scope of the dam
Antalya Airport Project Status: Completed Year of Production: 1973-1977 Route: Antalya Field: 100.000 m2 Location: Antalya The scope of construction consists of a 3,400 x
İstanbul Atatürk Airport Project Status: Completed Year of Production: 1977-1980 Route: İstanbul Field: 235.000 m2 Location: İstanbul Brief information about the construction of Istanbul Atatürk
Karakaya Dam Project Status: Completed Year of Production: 1976 – 1987 Route: Diyarbakır – Çüngüş Field: 9.580,00 hm³ Location: Diyarbakır ADMINISTRATION State Hydraulic Works (DSİ)-TURKEY
Sivas – Kangal Thermal Power Plant Project Status: Completed Year of Production: 1977 – 1990 Route: Sivas – Kangal Field: 500.000 m2 Location: Sivas The
Afşin-Elbistan Thermal Power Plant Project Status: Completed Year of Production: 1998 Route: Kahramanmaraş – Afşin Field: 500.000 m2 Location: Kahramanmaraş ERG-VERBUND Electricity Generation Company, in
Ankara – Gökçekaya High Voltage Line Project Status: Completed Year of Production: 1998 Route: Ankara – Gökçekaya Field: 80 km Location: Ankara 380 kV High
Artvin – Ardahan Highway Project Status: Completed Year of Production: 1998 Route: Artvin – Ardahan Field: 36 km Location: Artvin The protocol signed between the
Deriner Dam Project Status: Completed Year of Production: 1997 – 2011 Route: Çoruh River Field: 26,40 km² Location: Artvin Deriner Dam is a dam located